Skip to main content

MVP Cost Calculator

Free MVP cost calculator: pick your SaaS MVP features and get an instant development cost estimate for in-house, freelancers, an agency or a fixed price.

An MVP budget depends on which features you build first, their complexity and the responsibilities included in the work. Compare the same scope across quotes and allow for testing and integration. Use this calculator as a planning starting point, not a provider’s commitment.

Tick the features your first version actually needs and this calculator estimates the scope in developer-weeks, then prices it across every realistic build path — including AsyncForge’s fixed-scope MVP package. Start lean: the fewer features, the faster and cheaper you validate.

AsyncForge’s separate €1,999 fixed-scope MVP package covers an agreed lean product with a two-week delivery plan. The calculator models selected features using illustrative effort and rate assumptions across delivery options. Selecting more features does not make them part of that fixed-price package; confirm scope, eligibility and the delivery plan on the intro call.

Model and explanation updated November 2026

Pick your MVP scope

Select the features your first version needs.

MVP features

2-business-day turnaround

Estimated MVP scope

4 features · ≈ 10 dev-weeks

Roughly 2.2 months of focused senior development.

In-house hire

€39,189

€10,008/mo · 4.2 months

Freelancer

€28,379

€12,800/mo · 2.7 months

Dev agency

€55,289

€24,938/mo · 3.2 months

AsyncForge subscription

€8,868

€4,000/mo · 2.2 months

Or skip the estimate entirely

AsyncForge fixed-scope MVP — €1,999 in 2 weeks

A separate package with an agreed lean scope. Extra features selected above are not automatically included.

Assumptions

  • Feature effort is expressed in developer-weeks for a clean build by one senior engineer, based on how long these same features took us.
  • A flat 20% is added for integration, testing and the glue work between features — the part estimates usually miss.
  • Work is priced as one senior developer building sequentially, not a parallel team.

These are planning assumptions for comparing delivery models, not an industry study or a quote. Replace the inputs with your own costs and supplier quotes. Our subscription prices are listed on the pricing page.

Estimates only. Feature effort is approximate and assumes a clean build by a senior engineer, plus 20% for integration and QA. Your real scope depends on edge cases and design complexity — the fixed-scope package requires its own scope agreement.

How this estimate is calculated

From features to effort

Each feature carries an approximate effort in developer-weeks for a clean build by a senior engineer. We add 20% on top for integration, testing, and the glue work that connects everything — the part estimates usually forget.

From effort to cost

That effort is then priced as a single senior developer building sequentially, across in-house, freelance, agency, and subscription paths. Real scope depends on design complexity and how many edge cases you choose to handle before launch.

The fixed-price alternative

The separate €1,999 MVP package covers an agreed lean scope with a two-week delivery plan. It is not a promise to deliver every feature selected in this calculator for that price. Ongoing development uses a monthly subscription from €2,000; confirm package eligibility and scope on the intro call.

Worked example: a monthly subscription

Four paid months on Standard cost 4 × €4,000 = €16,000 excluding VAT. This is a budget example using the published subscription price, not a quote for the selected features. The number of months depends on the agreed scope and your priorities.

See subscription prices and terms

Frequently Asked Questions

How much does it cost to build an MVP?

The cost depends on the agreed features, complexity and delivery model. AsyncForge’s separate fixed-scope package is €1,999 excluding VAT for a qualifying lean MVP; it does not cover every combination of features in this calculator. Compare written scopes and quotes before committing.

What features does an MVP actually need?

Usually four: a way for users to sign up, your single core feature that solves their problem, a way to collect payment, and enough polish that early adopters take you seriously. Admin panels, analytics, and integrations are valuable but rarely belong in version one — add them once you have validated demand.

How long does it take to build an MVP?

A lean MVP is a matter of weeks, not months, when scope is tight. AsyncForge ships a fixed-scope MVP in two weeks. The timeline grows with each additional feature, so the fastest way to launch is to cut scope ruthlessly and ship the smallest thing that proves the idea.

Discuss your MVP scope

Discuss the separate €1,999 fixed-scope MVP package or an ongoing subscription from €2,000/month. We confirm the scope and delivery plan before work starts.